Central Neighborhood Health Foundation

Project: Low Voltage Cabling

INSTALLATION OF:

  • 280 DATA LINES
  • OM3 FIBER CABLING
  • DATA/IT ROOM BUILD OUT


Love Animal Hospital

Project: Low Voltage Cabling

INSTALLATION OF:

  • SURVEILLANCE SYSTEM
  • TELEPHONE SYSTEMS
  • AV SYSTEMS
  • INTERCOM SYSTEM
  • ACCESS CONTROL SYSTEM
  • STRUCTURED CABLING SYSTEM

Ayres Hotel- Rialto Ca

Project: Low Voltage Cabling

Scope: Cat6 and COAX cabling for 135 rooms, 30 IP cameras around perimeter of building.

12 Strand OM4 Fiber Optic to each floor. Fluke Testing and certification


LENNAR 3 ROOTS WELLNESS CENTER

Contractor- C&S Companies

Location- San Diego, CA

SOW: New cabling, New Surveillance System, Access Control System

THE COLAB SPACE

PROJECT AT A GLANCE

Location- Irvine, CA

SCOPE: New cabling, New Surveillance System, Wireless system, Installation of 12 strand OM3 Fiber cable

Cars Pro Kia – New Construction

PROJECT AT A GLANCE

Contractor- Monarch Construction

Location- Moreno Valley, CA

SOW: New cabling, New Surveillance System, Music & Intercom System Integration

Home wood Suites, Santa Clarita Ca

Low Voltage Cabling

Cat6 and COAX cabling for 200 rooms, JBL Speakers for all GYM, POOL AND LOBBY

64 IP cameras around perimeter of building.

Giovanni Hair Care Inc

Location: Compton, California

SOW: Installation of 35 Fixed cameras, PTZ and Fisheye cameras


Metropolitan Animal Specialty Hospital (MASH)
Location: Hollywood, California
SOW: Cabling, Surveillance, Access Control

Jet Center
Jets Center Hawthorne– New Construction 
Architect- Rivers & Christian
Location- Hawthorne, CA 
SOW: New cabling, New Surveillance System, Video Intercom System Integration
Honda of Downtown Los Angeles
The 10th largest car dealership in the nation, Honda of LA was to be a state of the art facility. Needing to full fill customer expectations with the newest technology and facilities to make the customer experience one of a kind. Telecomp installed 73 IP cameras, 400 Network cables and a 10GB fiber-optic backbone, we were able to deliver a world class network infrastructure for their new building. For the PA & music system we were able to blend in with the ceiling using 2x2 lay in speakers. Sonos players were installed so management can select music from any device on the wireless network.
Cars Pro Kia – New Construction 
PROJECT AT A GLANCE 
Architect- Carlie Coastworth 
Location- Carson, CA 
SOW: New cabling, New Surveillance System, 
Music & Intercom System Integration
Cars Pro Broke ground late 2015. This was to be their flagship store, with the newest technology and facilities to make customer service first. With over 50 IP cameras, 400 Network cables and a 10GB fiber-optic backbone, we were able to deliver a world class network infrastructure for their new building. 

Telecomp utilized Cat6 cable with 550 MHZ of network speed. For the PA & music system we were able to blend in with the ceiling using 2x2 lay in speakers. For an added bonus we installed volume control for 9 zones to raise and lower music volume for different locations making things simple and easy for management. Telecomp chose to use the newest technology for the surveillance system. We installed 360 degree panoramic cameras ( 4mp) for a sharper and more clear image. Plus the low profile cameras blend right in with the ceiling system, making almost un-noticeable. For the exterior, we installed Dark Fighter PTZ cameras, with 30x zoom. We setup Auto Tracking, which turns 1 camera into 3, making it a more cost effective solution. 
Foothill Regional- Low Voltage Work 
PROJECT AT A GLANCE 
Architect- GREGG MAEDO + ASSOCIATES, INC 
Location- Tustin, CA
SOW: Replacement of PA & TELEMETRY Systems
OSHPD Project: S150131-30-00 
Replacement of Overhead PA system and Telemetry System.This Project consisted of low voltage work to replace all COAX wiring and Speaker wiring. 89 speakers had to be replaced with new 8” ceiling speakers. A Total of 39 new Telemetry devices were installed with new wiring. All work was approved by State FLSO and State Inspector.
Alta Bellflower– New Construction 
PROJECT AT A GLANCE 
Architect- Gevork Consulting Engineering 
Location- Bellflower, CA 
SOW: Surveillance System in Parking structure
OSHPD Project#: S161035-19-00 
Installation of 21 HD Cameras, 1080p. The customer required full coverage of their parking structure. Over 500 feet of conduit was installed with 1 ¼” all thread to support the conduit and cameras. Telecomp also installed a new 2” conduit from the parking structure to the customers network room on the second floor to feed all of the network cameras. All work was approved by State FLSO and State Inspector.
Alta Norwalk– New Construction 
PROJECT AT A GLANCE 
Architect- Gevork Consulting Engineering 
Location- Norwalk, CA 
SOW: Addition Of Surveillance System
OSHPD Project#:S151967-19-00 
Installation of 21 HD Cameras, 1080p. The customer required interior as well as exterior camera views throughout the Hospital facility. Over 300 feet of conduit was installed. DuraBlok was installed to support conduit installation on the roof . Telecomp also installed Hilti Speed-sleeves for all firewall penetrations. All work was approved by State FLSO and State Inspector. 
Car Pros Kia Moreno Valley | Bellflower, CA | Telecomp Enterprises Inc.
Cars Pro Kia – New Construction
PROJECT AT A GLANCE
Contractor- Monarch Construction
Location- Moreno Valley, CA
SOW: New cabling, New Surveillance System, Music & Intercom System Integration